Yokogawa DCS – System Integration Services

Through our extensive experience, PROVECTA is uniquely placed in Australia to provide a full suite of system integration services for the whole range of Yokogawa  DCS equipment.

We have been providing system integration services for clients with Yokogawa DCS’s since 2004 and have successfully completed numerous projects utilising the following equipment;

  • Centum XL
  • Centum CS
  • Centum CS3000
  • Centum VP
  • CAMS
  • Stardom
  • FastTools
  • Exaquantum

Services that we have provided include;

  • DCS architecture design and implementation
  • Upgrade from PLC to Yokogawa DCS controls
  • Version upgrades (i.e. CS3000 to VP)
  • HMI upgrades
  • V-Net and V-Net IP Network design
  • 24/7 Breakdown support
  • Controls tuning
  • Owners Engineer consulting support
  • Historian configuration & development

Clients for whom we have provided Yokogawa System Integration services include;

  • Liddell Power Station (Hunter Valley, NSW)
  • Bondi Wastewater Treatment Plant
  • Bluewaters Power Station (Western Australia)
  • Channel Island & Weddell Power Stations (Darwin)
  • Beverley Uranium Mine (South Australia)
  • Wallerawang  Power Station (NSW)
  • Northern and Augusta Power Stations (South Australia)
  • Cadia Gold Mine (Orange, NSW)
  • Pha Lai Power Station (Vietnam)
  • Air Liquide (Sydney)
  • Torrens Island Power Station (South Australia)
Yokogawa FCS
Should you wish to discuss any aspect of our Yokogawa DCS System Integration services, please contact Mr Andrew Oates at the following contact details:

Mr Andrew Oates   Andrew.Oates@provecta.com  P +61 2 8204 5410  M +61 408 256 039