News

May ‘12, PROVECTA wins Schneider Electric NSW System Integrator of the Year Award for 2011

PROVECTA was pleased to be awarded the 2011 Schneider Integration Partner of the Year award for New South Wales at the annual NSW Schneider System Integrator Dinner held in Sydney on 9th May 2012. This is the fourth time in … Read more »

Plantstruxure-certified-logo3

Mar ’12, PROVECTA is now a Schneider Platinum System Integrator

PROVECTA has recently been confirmed as a Schneider Platinum System Integrator which is the highlest level of integrator. Our “Platinum” status is recognition that over recent years PROVECTA has maintained a strong working relationship with Schneider. Our “Platinum” status was … Read more »

Plantstruxure certified logo

Oct ’11 – Provecta Awarded Wivenhoe C&I Upgrade

Wivenhoe Power Station is Queensland’s only pumped storage hydroelectric plant. The 500 megawatt power station is located on the eastern side of Wivenhoe Dam, about 90 kilometres north-west of Brisbane and comprises two 250 megawatt units. Provecta was recently awarded … Read more »

Wivenhoe_1

Feb ’11- Provecta to tune USA’s largest greenfield coal-fired power project

Provecta has been engaged by Bechtel Power Corporation to provide controls optimisation, operations advice and related engineering services at Prairie State Energy Campus, a 2x 800MW net supercritical coal-fired plant at Lively Grove, southern Illinois. The plant is being wholly … Read more »

Prairie State Energy Campus

Aug ’10 – Provecta awarded Weddell Power Station Upgrade

Provecta has been engaged (after an open Tender process) to integrate the existing Weddell Power Station (WPS) Unit 1 and 2 Control Systems and the proposed new Unit 3 Control System into Power and Water Corporation’s existing Yokogawa CS3000 system … Read more »

Weddell_Power_Station
Page 1 of 612345...Last »