Boiler Controls Implementation – Indonesia

PROJECT TITLE:
Tanjung Jati B Power Station (Indonesia) – Boiler Controls

CLIENT:
Toshiba International

PROJECT DESCRIPTION:
On this project PROVECTA was responsible for the configuration and testing of the DCS control logic for the boiler sequences and auxiliaries, Flue Gas Desulphurisation, and common plant for the 2 x 660MW Tanjung Jati Power Station in Indonesia.  PROVECTA also undertook a review of the boiler modulating control philosophy and developed the site commissioning procedures for the modulating controls.  In addition to the above tasks, PROVECTA also configured the graphical operator interface for the entire plant.