Provecta has been engaged (after an open Tender process) to integrate the existing Weddell Power Station (WPS) Unit 1 and 2 Control Systems and the proposed new Unit 3 Control System into Power and Water Corporation’s existing Yokogawa CS3000 system at Channel Island Power Station (CIPS). Click here for further information on this project